![]() Further, these activities’ implementation processes were constructed based on optimized information flows from a partitioned dependency structure matrix. ![]() Through an investigation of information-dependency relationships, 22 constructability activities were linked with 33 design activities. ![]() Thus, by considering appropriate timing and detail levels when applying construction knowledge, this study proposes a process for integrating constructability activities related to temporary work into the design phase in high-rise concrete buildings. However, existing approaches for reflecting constructability rely heavily on reviews, resulting in an inefficient decision-making process. With the increase in high-rise building construction, failure to consider constructability in the design phase can result in huge wastes in the construction phase, as well as losing opportunities for design improvement.